SARASOTACONCRETECall (941) 274-3561
Concrete · Fruitville & Bee Ridge

Concrete slabs and pads in Fruitville and Bee Ridge

Boat, RV, shed and generator pads on half-acre lots where the water table decides the base.

Jurisdiction
Sarasota County
Permit page
rules and office
Drive from Sarasota
10 to 20 minutes
Service
Concrete Slabs & Pads

What does a pad cost in Fruitville or Bee Ridge?

Small pads about $9 to $15 per square foot and larger slabs $8 to $12, so an AC pad runs $350 to $700, a 10-by-12 shed pad $1,200 to $2,000, a 12-by-30 boat pad at 6 inches with #4 bar $3,200 to $4,800, and a 14-by-45 RV pad $5,500 to $8,000. Pads sit 2 to 4 inches above grade so August rain doesn't stand against the equipment.

Planning band from the September 10, 2026 cost tables; not a quote.

What's different about slabs & pads in Fruitville & Bee Ridge

The half-acre and acre lots along Bee Ridge, Fruitville and Lorraine roads are where the county's boat trailers, RVs, workshops and generators live, and where the ground is worst for them: flatwoods sand with a shallow water table and a hardpan that keeps it wet. Every pad here gets a compacted subgrade, 6 inches of base for anything a vehicle sits on, a raised edge, and a slope to the swale. Generator pads are poured to the manufacturer's template; shed pads under 100 square feet follow the county's shed exemption.

Zoning on the larger lots allows accessory structures the small lots don't; the county checks setbacks and the 50 percent impervious cap.

Rules that apply here

Detached sheds of 100 square feet or less generally exempt; larger pads and any structure on them reviewed through Accela; generator and AC pads usually ride with the equipment permit (county rules); ARC review in the newer Fruitville subdivisions.

A worked example

A 1991 home on an acre off Lorraine Road: a 14-by-40-foot RV pad, a 12-by-16 shed pad and a generator pad. Scope: subgrade proof-rolled (soft pocket found and dug out), 6 inches of base for the RV pad and 4 for the others, RV pad at 6 inches with #4 bar on 18-inch centers and a steel plate at the jack point, shed pad at 4 inches with a thickened edge, generator pad to the template with conduit sleeved, all raised 3 inches above grade and sloped to the swale. County permit for the shed (over 100 square feet) and the generator. Cost band: $9,000 to $13,000 for the three.

Does a boat pad need a permit in unincorporated Sarasota County?

As a slab with nothing on it, often not, though the county's zoning review checks setbacks and impervious cover; with a cover or a structure on it, yes. Ask Accela before pouring; the answer is free and the after-the-fact permit isn't.

Where to go next

Request an estimate in Fruitville & Bee Ridge

By sending, you agree Sarasota Concrete may contact you about this request and may forward it to the insured provider that serves your area. Reply STOP to end texts. See the privacy policy.

Rather talk? Call or text (941) 274-3561

Last reviewed September 10, 2026 by the Sarasota Concrete editorial team (author name pending owner input).